Download PDF version (132.3k). The full text of this article is available as a PDF document.
While snow and cold shut down most heavy construction in St. Paul, Minn., concrete pours continued for the Wabasha Street Bridge. Although average temperatures in November and December were 25°F and 13°F respectively, teamwork resulted in better-than-expected placement.