Download PDF version (154.3k). The full text of this article is available as a PDF document.

When it comes to awaiting lab test results or submitting mix designs in the ready-mix business or keeping up with design changes in design-build precasting, the producer wants information yesterday.

Take test results, for example. The producer often faces a two-week wait after submitting cylinders to an independent testing lab, since the results traditionally arrive through the mail. An e-solution that would reduce this cycle