Download PDF version (262.3k) The full article is available as a free PDF document.

Manufacturers of water chilling equipment remind the producer to consider five operational factors before purchasing chilling and chilled-water storage equipment.

  1. Chilled water volume needed
  2. Material moisture content and temperature
  3. Delivery time and distance
  4. Water source and disposal
  5. Ways to keep supply constant