Designed for Success

View of Kloosterboer Dock from Ballyhoo Mountain. An 80,000-square-foot cold storage warehouse was built at the dock.

Due to strength and seismic requirements, the Kloosterboer Dock project included a double rebar mat. The producer used a high-range water reducer to improve the concrete's workability, allowing it to be placed more easily.

A Smokey Point Aleutian Concrete truck delivers materials in December.

Self-consolidating concrete with polycarboxylate water reducers is ideal for precast, with its ability to flow easily into forms and achieve high strength more quickly than a traditional concrete mix.

Join the Discussion

Please read our Content Guidelines before posting