What Would They Think?

On the Nevada approach deck, crews place concrete to construct the southbound right side barrier railing.

In addition to the bridge, the entire project included 3.5 miles of approach roads in Nevada and Arizona.

Inside the form traveler system at arch segment NV13-LT, Obayashi/PSM crews place concrete into the bottom slab formwork.

Then and Now