A customer recently divided the placement of a large slab-on-grade warehouse floor into 2 pour days. The plans required the contractor to apply a metallic-aggregate dry-shake hardener. For each pour, a standard 3500-psi concrete mix, without air, was pre-ordered. But on the second day, the crew was...